International Journal of Production Research · 2010 · 65 citations · 40 references
ManagementIndustrial EngineeringManufacturing EngineeringCapacity PlanningOptimizationProduction EngineeringProduction SchedulingResource-constrained SchedulingScheduling OptimizationScheduling TheoryStochastic ProgrammingStochastic SchedulingDecomposition-based OptimizationDisassemblyDisassembly PlanningLagrangian OptimizationProduct Disassembly PlanningProduct End-of-life ManagementProduct Structure ModelingStochastic Inventory Systems
This paper considers disassembly scheduling, which is the problem of determining the quantity and timing of the end-of-use/life products to be disassembled while satisfying the demand for their parts obtained from disassembling the products over a planning horizon. This paper focuses on the problem with stochastic demand of parts/modules, capacity restrictions on disassembly resources, and multiple product types with a two-level product structure. The two-level product structure implies that an end-of-use/life product is hierarchically decomposed into two levels where the first level corresponds to the parts/modules and the second level corresponds to the product. We formulate the problem as a stochastic inventory model and to solve the problem we propose a Lagrangian heuristic algorithm as well as an optimisation algorithm for the sub-problems obtained from Lagrangian decomposition. The test results on randomly generated problems show that the Lagrangian heuristic algorithm demonstrates good performance in terms of solution quality and time.
40
Validation of subgradient optimization
Michael Held, Philip Wolfe, Harlan Crowder · Mathematical Programming · 1974 · 1.4K citations
International Journal for Management Science
In Lagos Area · 2013 · 968 citations
Design for Assembly and Disassembly
G. Boothroyd, Leo Alting · CIRP Annals · 1992 · 457 citations
Engineering, Manufacturing Engineering, Systems Engineering +10