SPE Annual Technical Conference and Exhibition · 1988 · 14 citations · 3 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringHydraulic FracturingDrilling HydraulicsFracture InitiationHorizontal DrillingWell CompletionWellbore HydraulicsFracturesHorizontal Well StimulationMechanical StimulationMultiple FracturesPrincipal Stress OrientationProppant Placement
ABSTRACT The number of horizontally drilled wells has continued to increase in the past few years. Nearly all of these well s have been completed as "drainholes" with slotted or perforated liner and without a cement sheath. The majority of these have been successful in their designed intent. Hydraulic fracturing treatments have been performed on a relatively small number of these wells. To be effectively fracture stimulated, a horizontally drilled well must be cased and cemented through the horizontal producing section of the well. Casing and cementing the horizontal section allows fracture initiation points to be controlled in placing multiple fractures. In situ stresses greatly influence the potential effectiveness of any fracturing treatment procedure. The one factor which most directly affects horizontal wellbore fracturing is the least principal stress, which is at a right angle to the induced fracture. The direction of the horizontal segment of the borehole dictates whether or not the induced fracture will be parallel or at an angle to the borehole. The use of properly applied controlled entry techniques at several fracture initiation points will help allow equal placement of proppant or reactive fluids in one stimulation treatment. Ei ther fracturi ng wi th proppant or fracture acidizing can be used in the stimulation treatment. The potential economic benefit to be derived from a successful multiple entry fracturing treatment merits strong consideration be given to the development of fracturing techniques to help obtain maximum wellbore drainage. Subject paper explains techniques and methods to be used in creating and placing proppant and/or reactive fluids in each of the multiple fractures in a horizontally drilled well. Economic considerations of the simultaneous stimulation treatment procedure are presented and compared to a vertical well under similar conditions.
3
In-Situ Stress Measurements During Drilling
Abbas Ali Daneshy, G. L. Slusher, P. Chisholm et al. · Journal of Petroleum Technology · 1986 · 34 citations
Engineering, Geological Engineering, Petroleum Engineering +17
Problems associated with deviated-wellbore cementing
Stuart R. Keller, R.J. Crook, Richard Haut et al. · Soc. Pet. Eng. AIME, Pap.; (United States) · 1983 · 21 citations