Journal of the Operational Research Society · 1994 · 63 citations · 8 references
EngineeringBiomedical EngineeringUncertainty QuantificationEquipment MaintenanceInventory Control SystemsInventory Replenishment SystemsMedical Device DesignMedical Device SafetyRobust Statistical ModelingMedical Equipment AvailabilityMedical Equipment IntegrationMedical Equipment Replacement PlanningReplacement Under UncertaintyStochastic Replacement Models
Perceived shortcomings in the applicability of capital equipment replacement modelling, identified in a 1987 survey within the UK are addressed and a robust replacement model formulated. First, however, a comparison between the 1987 survey and a similar 1988 survey undertaken within the USA is made and explanations for apparent differences in conclusions are presented. A replacement model is then developed in the context of medical equipment where factors such as service and risk play a role in replacement decision-making. A mechanism for quantitatively allowing for qualitative and for political type factors within a short time horizon replacement model is introduced by means of a penalty factor. A case example is presented for medical ventilator equipment.
8