All Days · 2000 · 26 citations · 6 references
EngineeringGeologyPetroleum EngineeringHydraulic FracturingReservoir EngineeringReservoir SimulationFractured Reservoir SimulationHorizontal DrillingUnconventional Reservoir EngineeringWell ModelingWell Performance AnalysisField Development OptimizationFlow In Tight Gas ReservoirsFluid Distribution Along Horizontal WellsFractured Reservoir ModelingHorizontal Well DrillingHorizontal Well ModelingNumerical Stability AnalysisTight Reservoir Geology
Abstract The concept of multiple fractured horizontal wells has been successfully used for the development of a deep, ultra-tight Rotliegendes gas reservoir. Because of extremely low permeabilities (0.01 – 0.02 md) conventionally fractured vertical wells produced at uneconomically low gas rates. The pilot well Soehlingen Z10 combined the methods of horizontal drilling and multiple fracturing and proved an economic technique for developing the significant gas resources in the tight gas reservoir. An integrated 3-D geologic model and a field-scale reservoir simulation model were used to optimize future field development. The wells were modelled with a system of local grid refinements (LGR) around the horizontal wells. Adjusting permeabilities and cell sizes of the hydraulic fractures and the surrounding reservoir area helped solve the numerical stability problems without affecting simulation of long-term production performance. The history match for the existing multiple fractured horizontal well, Soehlingen Z10, was based on a five-year production period. Previous analytical studies were confirmed by numerical results. A multi-well program was developed with up to eight wells of 1,000 to 1,500 m long horizontal sections. Each well will be stimulated by 5 to 7 hydraulic fractures depending on the horizontal section length. Timing and sequence of the planned tight gas wells were analyzed using an integrated subsurface-surface study. The development plan incorporates the spare capacity of existing surface facilities and the actual production decline of other producing horizons in the field. Following this study, the Soehlingen Z13 well was drilled, stimulated and brought on production in 1999.
6
Hydraulically Fractured Horizontal Well Simulation
T. M. Hegre · 1996 · 31 citations
Engineering, Computational Engineering, Petroleum Engineering +17
Productivity of Multifractured Horizontal Wells
T. M. Hegre, Leif Larsen · All Days · 1994 · 24 citations