Advanced materials research · 2013 · 21 citations · 6 references
EngineeringIndustrial EngineeringSystems EngineeringProduction EngineeringProduction SystemsSchedulingProduction Planning SystemsProduction SchedulingScheduling TheoryDisjunctive Graph RepresentationScheduling Analysis
The paper presents a solution useful for production scheduling in the context of the constraints arising from the complexity of the structures of realized processes and possibilities of use variants of their implementation. The proposed method uses both activity on arc and activity on node types of graph for describing multivariant processes. Representation of complex (composed) structures the AND-OR graphs are used that combines both conjunction and disjunction relations between nodes.
6
Pupong Pongcharoen, Chris Hicks, PM Braiden et al. · International Journal of Production Economics · 2002 · 144 citations
Management, Industrial Engineering, Manufacturing Engineering +14
AND/OR Tree Search for Constraint Optimization
Radu Marinescu, Rina Dechter · 2004 · 18 citations