IEEE Transactions on Systems Man and Cybernetics Systems · 2012 · 192 citations · 31 references
EngineeringIndustrial EngineeringManufacturing EngineeringComputer-integrated ManufacturingManufacturing ProcessesSchedulingPetri NetsProduction SchedulingCycle TimeCycle Time AnalysisMulti-period SchedulingOptimality ConditionsPetri Net AnalysisPetri Net ModelsSwap OperationsTransient State Analysis
There are wafer fabrication processes in cluster tools that require wafer revisiting. If a swap strategy is applied to dual-arm cluster tools handling wafer revisiting, a three-wafer periodical process is formed with three wafers completed in each period. Such a period contains three cycles in a revisiting process and three cycles in a nonrevisiting one. Hence, analysis and scheduling of such tools become very complicated. In this paper, a Petri net (PN) model is developed to describe their operations. Based on it, it is found that, if a swap strategy is applied, such tools are always in a transient state. A systematic method is then presented to analyze their performance. With the help of the proposed PN model, this work, for the first time, derives the optimality conditions of three-wafer period scheduling. Industrial application examples are given to show the results.
31
Petri nets: Properties, analysis and applications
T. Murata · Proceedings of the IEEE · 1989 · 10.5K citations
Naiqi Wu, Chengbin Chu, Feng Chu et al. · IEEE Transactions on Semiconductor Manufacturing · 2008 · 230 citations
Engineering, Industrial Engineering, Manufacturing Engineering +14