SPE Annual Technical Conference and Exhibition · 2003 · 10 citations · 4 references
EngineeringOcean EngineeringPetroleum EngineeringReservoir EngineeringWater Resources EngineeringWater TreatmentDeepwater DrillingWell Completion DesignFrac Plug CompletionInjectivityInjectivity ImprovementInjectivity PerformanceInjector DesignOpenhole CompletionSeawater DesalinationWater Injection
Abstract A Gulf of Mexico deepwater subsea development project required seawater injection for pressure maintenance of the producing reservoir. Typical water injector performance in the Gulf of Mexico has been characterized by rapidly declining injectivities that could be partially restored by frequent acid treatments. This type of performance was unacceptable for this field development plan, which required one subsea water injector capable of injecting up to 25,000 BWPD continuously for up to five years. Two changes to typical Gulf of Mexico water injector completion design were incorporated: 1) an openhole frac pack completion, and 2) a unique downhole filter system. These changes resulted in improved water injector performance compared with that typically experienced in the Gulf of Mexico. Initial injectivity was excellent and remained so over the entire injection period. No acid stimulations were required to either initiate or maintain injection. This paper presents the design and installation aspects as well as the actual performance results for this water injector.
4
Optimising Water Injection Performance
R. W. Paige, L. R. Murray, João Paulo Martins et al. · Middle East Oil Show · 1995 · 29 citations
Engineering, Petroleum Engineering, Water Resources Management +16
Optimising Water Injection Performance
R.W. Paige, L.R. Murray, J.P. Martins et al. · Proceedings of Middle East Oil Show · 1995 · 26 citations
Engineering, Petroleum Engineering, Water Resources Management +16