Monitoring Production from Gravel-Packed Sand-Screen Completions on BP's Azeri Field Wells Using Permanently Installed Distributed Temperature Sensors

John Davies, Farida Mammadkhan, George Brown

SPE Annual Technical Conference and Exhibition · 2007 · 46 citations · 8 references

Concepts

Abstract

Abstract BP is developing its Azeri field using deviated gravel-packed sand-screen completions producing from the multilayered Pereriv B, C, and D reservoirs. Restricted wellhead access, high rates, and differential depletion of the different reservoir intervals limit conventional production logging possibilities, so BP has chosen to install permanent fiber-optic distributed temperature monitoring systems with its sand screens and to use these systems to monitor production rates and changes over time. The optic fiber has been installed on the periphery of the sand-screen shroud, effectively installing it in the gravel-packed annulus. When the gravel pack is completed, the fiber responds to the reservoir temperature plus the effect of Joule-Thomson warming of the flowing oil caused by the pressure drop (drawdown) in the near-wellbore region. Thermal mixing of the oil with flow from below only occurs once the flow has passed through the sand-screen wire-wrap. Thus a direct measure of each individual reservoir drawdown is obtained from the difference between the fiber-measured temperature and the geothermal temperature in the flowing reservoir intervals. Given the reservoir drawdown, the flow rate can then be calculated. Thus installing the fiber outside the sand-screens gives a unique, direct measurement of individual reservoir layer drawdowns, enabling the effects of differential depletion to be monitored over time. This paper outlines the completion technology used to install the fibers along the sand screens and shows the data and results obtained where reservoirs with different pressures are commingled through gravel-packed sand-screens. Thermal models of the near-well environment are described and used to analyze the data and to obtain the flow profile and reservoir layer pressures. The use of permanently installed fiber-optic distributed temperature monitoring systems on its Azeri reservoir has allowed BP to acquire early time-surveillance data, adding significant value by reducing the voidage risk to the secondary reserves.

References

8