International Journal of Production Research · 2014 · 89 citations · 24 references
ManagementOperations ManagementParallel AlgorithmsProduction PlanningSchedulingBranch And BoundFlow Shop SchedulingMachine SchedulingProduction SchedulingScheduling TheoryComputational Lower BoundsConstructive HeuristicsHeuristicsHybrid Flow Shop SchedulingLower BoundsNo-wait Flow Shop SchedulingTwo-machine Flow Shop SchedulingUpper Bounds
This research investigates a two-stage no-wait hybrid flow-shop scheduling problem in which the first stage contains a single machine, and the second stage contains several identical parallel machines. The objective is to minimise the makespan. For this problem, existing literature emphasises on heuristics or optimal solutions for special cases, whereas this paper proposes a branch-and-bound algorithm. Several lower bounds for optimal and partial schedules are derived. Also, three dominance rules are deduced, and seven constructive heuristics are used to obtain initial upper bounds. Extensive computational tests on randomly generated problems are conducted. The results with comparisons indicate that the proposed bounds (especially partial lower bounds), dominance rules and the branch-and-bound algorithm are efficient.
24
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations