SPE Drilling & Completion · 1998 · 18 citations · 5 references
EngineeringPetroleum EngineeringDrillingHydraulic FracturingReservoir EngineeringFormation TestingFrac Pack CompletionSand Control Completion DesignSand Production MechanismsTreatment DesignField Data CollectionField ObservationsFracturesNumerical ModelingSand ProductionSand Production ControlSand Production ModelingSand Production Prevention
Summary Some successful results have been reported for screenless frac-packing methods1–3; however, no scientific guidelines were given regarding the conditions under which a screen can be eliminated from a well. In this paper, we report field data from sand-producing wells and review the onset and the rate of sand production for those wells with and without hydraulic fractures. From these field observations and numerical modeling analysis, we give guidelines for when a screen must be run and when a screen can be eliminated.
5
Realistic Sand-Production Prediction: Numerical Approach
Nobuo Morita, Donald L. Whitfill, I. Massie et al. · SPE Production Engineering · 1989 · 156 citations
Engineering, Civil Engineering, Computational Engineering +17