International Journal of Logistics Research and Applications · 2012 · 21 citations · 10 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingCombinatorial OptimizationConstraint-based SchedulingGenetic AlgorithmsReal-time OptimizationReal-time SchedulingScheduling TheoryCranesGenetic Algorithm OptimizationInterferenceInterference ConstraintsQuay Crane Scheduling
A fast, robust and efficient algorithm for solving the problem of scheduling two quay cranes with non-interference constraints at Narvik container terminal has been developed. To solve the problem, a genetic algorithm approach is used and adapted to the case of two cranes. This approach manages to provide practical solutions and significant time savings for a real-life crane-scheduling problem. Operators at Narvik container terminal find the solution to be user-friendly, and it allows the user to change parameter settings and obtain solutions in real time.
10
A scheduling method for Berth and Quay cranes
Young-Man Park, Kap Hwan Kim · OR Spectrum · 2003 · 315 citations
Management, Industrial Engineering, Operations Management +13