Dynamic Modeling of Wellbore Pressures Allows Successful Drilling of a Narrow Margin HPHT Exploration Well in Malaysia

Noor Azree Nordin, Lawrence Umar, I. Abd Aziz, Steve Nas, Wing Keat Woo

IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition · 2012 · 10 citations · 0 references

Concepts

Abstract

Abstract Using a Dynamic Hydraulic and Well Control Simulator to predict and establish wellbore pressures in a narrow margin HPHT well has allowed the operator to set operational limits during drilling, tripping, casing and cementing operations. A previous attempt to reach the objectives for the well failed. A much more rigorous approach to wellbore pressure management was undertaken prior to drilling this second well. A complete review of the expected pressure limitations was conducted, this review included a detailed overview of pore and fracture pressures as well as casing setting depths, hole sizes, temperature effects and proposed mud weights. This resulted in an improved prediction of the pressure windows for each of the proposed hole sections. Each hole section was in turn reviewed for optimal mud weights and this included a detailed review of equivalent static, equivalent circulating and dynamic kick tolerance limitations for the proposed mud weights. Surge and Swab calculations then determined maximum tripping speeds and cementing calculations ensured that pore and fracture pressure limits were not breached with the proposed cement volumes and pump schedules. This paper presents the approach that was taken in proving a complete pressure management system for a narrow margin HPHT exploration well. The use of dynamic hydraulic models allowed accurate predictions of down hole pressures during virtually all drilling operational phases a hole section. Calculated down hole pressures were compared to PWD tools, proving that the accuracy of the dynamic hydraulic predictions was within the required limits to allow drilling without a PWD tool if required. Combining the available pore pressure and fracture pressure data, with mud weight schedules, pump rates, tripping rates and cementing operations allowed optimization of the drilling parameters thus ensuring that this narrow margin HPHT well, was drilled successfully to its target depth and all of its objectives were met.