SPE Reservoir Engineering · 1993 · 18 citations · 7 references
EngineeringCivil EngineeringEnhanced Oil RecoveryPolymer EngineeringReservoir EngineeringChemical FloodingFlood MitigationPolymer FloodingCrosslinked Polymer NetworksCrosslinked Polymer SystemsField Implementation Of Polymer FloodingPolymer Flood Performance EvaluationSubsurface Oil Recovery
Summary A freshwater polymer-flood project was implemented in a 1, 440-acre area of the North Burbank Unit (NBU) in 1980 with sequential injection of 4.2 million lbm of polyacrylamide and 4.0 million lbm of a 2.9% aluminum citrate crosslinking solution. Response to polymer flooding has been very pronounced, with ultimate incremental oil recovery projected to exceed 2.5 MMSTB of oil and total project oil expected to be 4.5 MMSTB. A crosslinked polymer-flood process for use in brine was developed that displays equally favorable performance characteristics as the freshwater polymer-flooding system.
7