Publication | Closed Access
Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off
108
Citations
7
References
2008
Year
Construction Project ManagementEngineeringPareto FrontIntelligent OptimizationTime–cost Trade-offDesignComputer EngineeringSystems EngineeringConstruction ManagementAnt Colony OptimizationCombinatorial OptimizationAco AlgorithmConstruction EngineeringInteger ProgrammingEvolutionary ProgrammingOperations Research
The time–cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a combinatorial optimization problem. This technical note employed an evolutionary algorithm—ant colony optimization (ACO) algorithm to deal with the time–cost trade-off problems. Combining with the modified adaptive weight approach, the ACO algorithm can find out the optimal solutions, and define the Pareto front as well. The development of the ACO-based multiobjective approach in this technical note provides an attractive alternative to solving construction time–cost optimization.
| Year | Citations | |
|---|---|---|
Page 1
Page 1