Identifying Effective and Ineffective Retrofits for Distortion Fatigue Cracking in Steel Bridges Using Field Instrumentation

Robert Connor, John W. Fisher

Journal of Bridge Engineering · 2006 · 103 citations · 12 references

Concepts

TL;DR

Nearly 90 % of fatigue cracking in steel bridges stems from out‑of‑plane distortion or secondary stresses, yet design and evaluation specifications provide no guidance for assessing in‑service fatigue risk, resulting in ineffective retrofits and recurrent cracking. The study aims to guide the instrumentation of fatigue‑prone details and evaluate prototype retrofits, illustrating how field data can expose ineffective strategies. The authors employ field instrumentation and testing to assess retrofit performance, offering guidance on instrumenting fatigue‑sensitive details and analyzing data from a case where initial retrofits failed. Field instrumentation uncovered unexpected behavior that prevented large‑scale retrofit failures, demonstrating that prototype retrofits can be ineffective and that early testing can avert future problems.

Abstract

It is estimated that nearly 90% of all fatigue cracking is the result of out-of-plane distortion or other unanticipated secondary stresses at fatigue-sensitive details. Neither design specifications nor evaluation specifications provide any guidance on how to evaluate the in-service potential for fatigue cracking at these details. Often, as a result, the effectiveness of various retrofit procedures is questionable and ill fated. There are many examples where implemented retrofit procedures did not work and fatigue cracking reinitiated or continued. Implementation of one or two prototype retrofits is an attractive alternative to ensuring effective retrofits are developed where many details have to be retrofitted. Field instrumentation and testing is an effective means to determine the effectiveness and behavior of a given retrofit strategy. Behavior that may not be anticipated can be identified prior to installing retrofits on a large scale, thereby preventing future problems. This paper provides guidance on how to instrument these details and examines one example where initial retrofit strategies did not work, as demonstrated by their performance through field instrumentation.

References

12