History, Trends and Evolution of Float-Over Deck Installation in Open Waters

Lee O’Neill, E. Fakas, Beverley F. Ronalds, P.E. Christiansen

SPE Annual Technical Conference and Exhibition · 2000 · 28 citations · 0 references

Concepts

Abstract

Abstract Float-over deck (FOD) installation is no longer a novel approach for heavy integrated decks. It is estimated that over 20 FOD installations have been carried out in open (unsheltered) waters over the past 20 years, which have proven the reliability and cost-effectiveness of this method. FOD installation is an alternative to lift-installing integrated decks using heavy-lift crane vessels. Although the former may not be the most cost-effective solution in areas where such vessels are readily available, it is increasingly becoming an important solution for deck installations in remote parts of the world. This is due to the considerable cost associated with crane mobilisation in such areas. FOD installation also accommodates integrated deck weights in excess of the lift capacity of crane vessels. This paper provides a database of all documented FOD installations in open waters to date and addresses the technical issues and challenges, with particular emphasis on the complexity, reliability and effectiveness of the technology used. Trends in deck weight and installation sea-states are also illustrated, confirming the growing confidence of the industry towards FOD installation. Indicative cost comparisons with alternative installation methods such as a single heavy lift or a multi-lift modular installation are also presented for some cases. The paper also elaborates on the limitations of installation methods used to date. Finally, a brief introduction is made to several recent innovations, which focus on the improvement of conventional FOD installation systems as well as the development of novel systems suitable for developments in Australia and worldwide.