Journal of the Operational Research Society · 2012 · 39 citations · 20 references
ManagementIndustrial EngineeringOperations ManagementInventory ManagementProduction PlanningSchedulingCapacity SizingLot SizingProcess EngineeringTime-scaled SchedulingBranch-and-bound Lot SizingInventory-dependent Lot SizingLot Sizing ControlMixed-integer Lot Sizing ModelsProduction Lot SizingStochastic Lot SizingTwo-stage Lot Sizing
In this paper, we propose three novel mathematical models for the two-stage lot-sizing and scheduling problems present in many process industries. The problem shares a continuous or quasi-continuous production feature upstream and a discrete manufacturing feature downstream, which must be synchronized. Different time-based scale representations are discussed. The first formulation encompasses a discrete-time representation. The second one is a hybrid continuous-discrete model. The last formulation is based on a continuous-time model representation. Computational tests with state-of-the-art MIP solver show that the discrete-time representation provides better feasible solutions in short running time. On the other hand, the hybrid model achieves better solutions for longer computational times and was able to prove optimality more often. The continuous-type model is the most flexible of the three for incorporating additional operational requirements, at a cost of having the worst computational performance.
20
Dynamic Version of the Economic Lot Size Model
Harvey M. Wagner, T. M. Whitin · Management Science · 2004 · 2.1K citations
Management, Industrial Engineering, Operations Management +17
The general lotsizing and scheduling problem
Bernhard Fleischmann, Herbert Meyr · OR Spectrum · 1997 · 249 citations
Management, Industrial Engineering, Operations Management +11