Publication | Closed Access
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
81
Citations
34
References
1994
Year
Mean TardinessHeuristic AlgorithmsSingle-machine Scheduling ProblemEngineeringUnequal Due DatesScheduling AnalysisScheduling ProblemSingle-machine Scheduling ProblemsProduction SchedulingSystems EngineeringScheduling (Production Processes)Scheduling (Computing)Real-time SystemsHeuristic ProceduresOperations Research
We consider a single-machine scheduling problem with the objective of minimizing the mean (or equivalently, total) tardiness and earliness when due dates may differ among jobs. Some properties of the optimal solution are discussed, and these properties are used to develop both optimal and heuristic algorithms. Results of computational tests indicate that optimal solutions can be found for problems with up to 20 jobs, and that two of the heuristic procedures provide optimal or very near optimal solutions in many instances. © 1994 John Wiley & Sons, Inc.
| Year | Citations | |
|---|---|---|
Page 1
Page 1