Abu Dhabi International Petroleum Exhibition and Conference · 1998 · 16 citations · 0 references
EngineeringEarth SciencesPetroleum EngineeringReservoir CharacterizationReservoir EngineeringReservoir OperationsReservoir ManagementReservoir OperationUnconventional Reservoir EngineeringReservoir DataReservoir EvaluationReservoir Pressure DeclineReservoir Pressure ProfilingSeismic Survey DesignWaterflood PerformanceWaterflood Performance EvaluationWaterflooding
Abstract The Mauddud formation is a major oil bearing carbonate reservoir in North Kuwait. Historical Production (spanning over 40 years) has confirmed that the reservoir receives very little natural pressure support. This has resulted in a declining reservoir pressure and low recovery factor. The forward development plan is to waterflood the Mauddud, increasing production rate and ultimate recovery. An assessment of the reservoir suggests that a pattern waterflood will be required to achieve the aggressive production profile while meeting targets for increased, ultimate reserve recovery. The waterflood pilot project (WFP) was planned to gather actual field data on waterflood performance in representative areas of the reservoir. A thorough screening of the available reservoir data was conducted in order to select suitable locations for the pilots. A limited area 3D seismic survey was shot over these locations to further check that no major reservoir anomalies were present in the planned pilot areas. Two inverted five spot pattern waterfloods were planned and constructed, one in each of the Raudhatain and Sabriyah fields. Production wells were completed with artificial (gaslift) lift capability to allow continued production as watercuts increased. A novel twin ESP source water system was constructed to take water from a deep aquifer source and pump this into the injection well at the necessary rate and pressure. A comprehensive data acquisition programme during the well construction and commissioning phase of the project allowed the essential base reservoir data to be acquired. A multiwell interference/Pulse test was conducted in both pilot areas prior to the start-of full production/injection, this confirmed good connectivity within the pilot areas. Full pilot operation commenced in June 97, with first water breakthrough (in some of the production wells) being observed 2–3 months after start-up. this was within the range of earlier predictions The pilot waterflood has already given a valuable insight into the performance of the Mauddud under waterflood conditions and the pilot results indicate the Mauddud can be successfully developed by adopting a pattern waterflood approach. Injectivity and productivity have been better than expected and the implications for sweep efficiency /directionality and reserve recovery look encouraging.