SPE Annual Technical Conference and Exhibition · 1980 · 22 citations · 5 references
EngineeringOperations ManagementConstruction Operations ManagementProcess ControlWell TestingCementing OperationsDrilling OperationsGas Migration ControlLeakage ControlWell ControlWell Performance AnalysisCementingField Trial EvaluationFlow-rate Control StrategiesGas ControlGas FlowGas Flow Control SystemsGas Flow DistributionWell Control Procedures
ABSTRACT Gas flow following cementing has hindered the completion of wells for a number of years. Research of this problem has indicated many solutions which have been either partially successful or unsuccessful in controlling gas flow following actual cementing operations. A theory describing the cause of this problem and a novel solution to the problem were presented in SPE 8257.1 This paper summarized the results obtained during a fifteen-month field application of the control method. Results of 250 cement jobs performed world-wide are summarized and specific examples are discussed in detail.
5