Concepedia

Publication | Closed Access

Status and recent results of the BAIKAL-GVD project

27

Citations

19

References

2015

Year

Abstract

The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of first autonomous engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. The prototyping phase will be concluded with deployment of the GVD demonstration cluster “DUBNA” in 2015, which will comprise 192 light sensors arranged at 8 strings. The first stage of the GVD demonstration cluster which consists of three strings was deployed in April 2013 and successfully operated up to February 2014. We review the prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.

References

YearCitations

Page 1