Publication | Closed Access
A Probabilistic Production Costing Methodology for Systems with Storage
16
Citations
2
References
1981
Year
EngineeringProduction CostingEnergy EfficiencyOperations ResearchLogisticsSystems EngineeringCost ManagementCombinatorial OptimizationQuantitative ManagementComputer EngineeringManufacturing PlanningSupply Chain ManagementProduction PlanningCost IssueEnergy ManagementScheduling ProblemProduction SchedulingBusinessDeterministic Scheduling ProblemLinear Programming ApproachEnergy Economics
Using the concept of an Expected Incremental Generation Cost Curve (EIGC), a new probabilistic production cost methodology is presented. This method, somewhat related to the Baleriaux-Booth equivalent load concept, is useful for production costing in both traditional systems and those involving storage. In fact, the probabilistic storage-thermal scheduling problem is shown to reduce to a deterministic scheduling problem easily solved using a linear programming approach.
| Year | Citations | |
|---|---|---|
Page 1
Page 1