IEEE Transactions on Reliability · 1986 · 219 citations · 7 references
EngineeringIndustrial EngineeringOperations ManagementMaintenance EngineeringMarkov Decision ProcessesCondition-based MaintenanceMaintenance ManagementMaintenance OptimizationMaintenance PolicyMaintenance StrategyPreventive MaintenanceMaintenance IntervalsPreventive Maintenance OptimizationPreventive Maintenance Scheduling
Simple preventive maintenance (Maintenance type 1P) and preventive replacement (maintenance type 2P) are scheduled in such a way that the system does not drop below a minimum reliability. Failure rate after maintenance type 1P lies between "good as new" and "bad as old". The degree of improvement in failure rate after maintenance type 1P is cailed the improvement factor. A set of curves for the improvement factor as a function of cost for maintenance type 1P and age of the system is proposed. The cost rate for a system is formulated as a ratio of an average cost for a cycle (time between replacements) to an average cycle length. An optimum number of type 1P maintenance actions before type 2P maintenance is obtained by minimizing the cost rate when the failure times are Weibull distributed. The optimum solutions are a function of improvement factors and predetermined upper limit of failure rate.
7
Optimum Preventive Maintenance Policies
Richard Barlow, Larry C. Hunter · Operations Research · 1960 · 1.4K citations
Engineering, Industrial Engineering, Continuous Improvement +13
Reliable Preventive Maintenance Scheduling
Mazhar Ali Khan Malik · A I I E Transactions · 1979 · 410 citations
Engineering, Industrial Engineering, Systems Engineering +17