Industrial & Engineering Chemistry Research · 2003 · 42 citations · 6 references
ManagementIndustrial EngineeringManufacturing EngineeringOptimizationProduction EngineeringSchedulingCombinatorial OptimizationInteger ProgrammingLot SizingProduction SchedulingSchedule OptimizationScheduling OptimizationInteger Linear ProgrammingLot SchedulingManufacturing Resource SchedulingMixed-integer Linear ProgrammingMixed-integer ProgrammingMixed-integer Programming For SchedulingProduction Planning Lot SizingScheduling Problems
Wet-etching in wafer fabrication is an automated process involving a complex interplay of mixed intermediate policies and material-handling constraints. Its operation poses a challenging resource-constrained flowshop scheduling problem that is crucial for enhancing productivity, improving yield, and minimizing wafer contamination. A novel continuous-time mixed-integer linear programming (MILP) formulation is presented for sequencing and scheduling wafer lots in an automated wet-etch station (AWS). Several reformulations and constraints are numerically evaluated to identify the best formulation. On the basis of this formulation, a near-optimum two-step strategy that is robust with respect to lot transfer times is developed for solving moderately sized problems.
6
Scheduling semiconductor manufacturing plants
P. R. Kumar · IEEE Control Systems · 1994 · 136 citations