International Journal of Mining and Mineral Engineering · 2010 · 11 citations · 15 references
EngineeringMining EngineeringOperations ManagementMine PlanningProduction PlanningSchedulingMine SchedulingMine SequencingProduction SchedulingBlendingDiscrete Event Simulation ModelsDiscrete-event System SimulationOpen-pit SchedulingShort-term Mine SchedulingShort-term Production SchedulingSimulation Model VerificationUncertainty In Mine Sequencing
Mine planning involves different levels of decision-making depending on the time horizon under consideration. The main goal of this study is to develop a discrete-event simulation model to link long-term predictive mine plans with short-term production schedules in the presence of uncertainty. We have developed, verified and validated a discrete-event simulation model for open pit production scheduling using the SLAM simulation language. The simulation model takes into consideration constraints and uncertainties associated with mining and processing capacities, crusher availability, stockpiling strategy and blending requirements. Application of the simulation model is presented by an iron ore open pit mine case study.
15
Reinforcement Learning: An Introduction
IEEE Transactions on Neural Networks · 2005 · 25.8K citations
Optimum Design of Open-Pit Mines
H. Lerchs · Medical Entomology and Zoology · 1965 · 396 citations