Full Field Tertiary Gas Injection: A Case History Offshore Abu Dhabi

E. Bonnin, B. Levallois, G. Joffroy

Abu Dhabi International Petroleum Exhibition and Conference · 2002 · 12 citations · 3 references

Concepts

Abstract

Abstract In 1997, a full field non-miscible tertiary gas injection scheme was implemented offshore Abu Dhabi. The purpose of the project was to enhance the oil recovery of a mature carbonate reservoir, in a field located on the border between U.A.E. and Iran. Analysis of the pilots and early stages of the full field development were extensively described by Stofferis1 and Nicolle2. The present paper focuses on the practical problems encountered and the solutions developed to tackle and efficiently manage this challenging project. The observed reservoir response to tertiary gas injection is first described at the well level and the main macroscopic parameters controlling this response are presented. The impact of the constraints linked to the surface facilities is then introduced and the overall field gas management policy explained. Finally, almost halfway through the designed project life, a technical and economical assessment is also presented together with the future project extensions.

References

3