Abu Dhabi International Petroleum Exhibition and Conference · 1998 · 14 citations · 1 references
EngineeringEarth SciencesPetroleum EngineeringReservoir EngineeringReservoir OperationsReservoir SimulationGas InjectionPetroleum System AnalysisUnconventional Reservoir EngineeringAir InjectionInfrastructure Project EvaluationNatural Gas DepletionSecondary Resource Recovery
ABSTRACT This paper gives a current evaluation of the Horse Creek air injection project. The field, located in North Dakota, USA, is operated by TOTAL MINATOME CORPORATION, the US subsidiary of TOTAL. This light oil reservoir (32° API) has an OOIP of 46 MMBBLS. It was produced under natural depletion from 1972. Air injection started up in May, 1996. At this time, the oil production was at the low level of 300 bbl/d (after having reached 1600 bbl/d in 1984). But 16 months later, in September, 1997, production was increased to 700 bbl/d thanks to air injection. The paper explains how air injection was decided in Horse Creek as a secondary recovery process. The principle of the air injection process into light oil reservoirs is also discussed. The project evaluation based on a geological review, numerical simulations and laboratory experiments is presented. The production data from the start-up of the air injection in May, 1996 to December, 1997 are given and the field performance appraised. A simulation update, performed in January, 1998, and integrating production data from 20 months of air injection, is finally presented.
1