European Petroleum Conference · 1990 · 25 citations · 1 references
EngineeringPetroleum EngineeringDrillingReservoir EngineeringWell TestingThermal-hydraulic Safety AnalysisWell ModelingWell Performance AnalysisWellbore HydraulicsPressure ControlSealsSurface Equipment DesignTemperature ProfilesWell Control EquipmentWellbore Pressure ModelingWellbore Pressure Profiling
SYNOPSIS Drilling into high pressure high temperature reservoirs gives rise to additional hazards which are not present in more conventional reservoirs. High surface temperatures and pressures may result when reservoir fluids are brought to surface either during production testing or in a well pressure control operation. Accurate estimation of pressure and temperature profiles is required during the well planning stage to ensure that downhole and surface equipment is specified which can meet these criteria. Critical temperature-sensitive equipment items include the elastomeric seals used in BOP's, valves, wellheads and flexible hoses. There is also a requirement for the calculation of temperatures downstream of the choke when circulating out a gas-kick under controlled conditions, in order to check for possible cryogenic temperatures and hydrate formation downstream of the choke valve. While computer simulation models are of great assistance in predicting surface pressures and temperatures, maximum use should also be made of available reservoir fluid data and historical production test data from similar wells in order to test and validate the models. Such an exercise has the dual benefit of highlighting any shortcomings within the models and increasing confidence in further predictive modelling.
1
The principles of chemical equilibrium
Scott E. Wood · The Journal of Chemical Thermodynamics · 1972 · 56 citations