International Journal of Production Research · 2005 · 14 citations · 13 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingCombinatorial OptimizationHeuristic OptimizationJob SchedulingMachine SchedulingPerformance OptimizationScheduling OptimizationFlow ShopLower Bound ComputationMulti-machine Flow Shop SchedulingTwo-machine Flow Shop SchedulingWorst-case ComplexityWorst-case Optimization
Abstract In this paper, we consider the problem of minimizing the total weighted completion time in an n-job, two-machine proportionate flow shop, where job processing times are inversely proportional to machine speeds. We show that the problem is NP-complete. We provide a tight lower bound to an optimal objective value and show that the worst-case performance ratio of the weighted shortest processing time rule is less than 2. We propose heuristic procedures to find an approximate solution for the problem. A computational study on randomly generated test problems is conducted to investigate the performance of the proposed heuristics. Keywords: Proportionate flow shopNP-completeMachine speedWorst-case performance ratioWeighted shortest processing time Acknowledgement This work was supported by the Soongsil University Research Fund.
13
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
Focused Scheduling in Proportionate Flowshops
Peng Si Ow · Management Science · 1985 · 115 citations
Management, Industrial Engineering, Operations Management +14