International Journal of Production Research · 1978 · 100 citations · 7 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingCombinatorial OptimizationCost MinimizationFlow Shop SchedulingHeuristic OptimizationScheduling TheoryTardiness MinimizationFlow ShopFlow Shop Tardiness SchedulingHeuristic AlgorithmsHeuristic SchedulingHeuristicsTotal Weighted TardinessWeighted Tardiness MinimizationWeighted Tardiness Scheduling
This paper concerns the minimization of a complex cost function in a flow-shop. Four heuristic methods for obtaining a good solution to the sum of weighted tardiness and weighted flow-time problem are proposed. Computational results are provided and a, recommendation is made with respect to other objective functions.
7
A Comparative Study of Flow-Shop Algorithms
Kenneth R. Baker · Operations Research · 1975 · 86 citations
Natural Sciences, Computer Science, Industrial Engineering +12