Integrating Six‐Sigma with other reliability improvement methods in equipment reliability and maintenance applications

Salman T. Al‐Mishari, Saad M. A. Suliman

Journal of Quality in Maintenance Engineering · 2008 · 52 citations · 16 references

Concepts

TL;DR

Six‑Sigma, traditionally used in manufacturing and recently in administrative processes, is being introduced into equipment reliability and maintenance applications for the first time. The paper aims to integrate Six‑Sigma DMAIC into equipment reliability improvement methods to address their reported weaknesses. The authors evaluated RCM weaknesses, examined how Six‑Sigma could fill those gaps, and tested the integrated approach in an example application, noting that it requires good data and is resource‑intensive. The study concludes that Six‑Sigma mitigates many RCM flaws, and when combined with other reliability techniques yields more objective and dependable results, offering a valuable new perspective for plant equipment reliability improvement. Six‑Sigma still has its own cons and limitations.

Abstract

Purpose The purpose of this paper is to address reported weaknesses with existing equipment reliability improvement methods through their integration into the Six‐Sigma DMAIC methodology. Design/methodology/approach The evaluation was done by assessing the weaknesses of traditional methods such as reliability centered maintenance (RCM), evaluating what Six‐Sigma could potentially offer to close the gaps, and testing potential improvements through an example application. Findings It is concluded that Six‐Sigma addresses many RCM flaws and weaknesses. It is also concluded that Six‐Sigma, if integrated with other reliability techniques, can produce results that are far more objective and dependable. Research limitations/implications Six‐Sigma, however, still bears its own cons and limitations. It requires good data which are sometimes unavailable. Six‐Sigma is also lengthier and consumes more resources per single problem since it focuses at one problem at a time. Originality/value The introduction of Six‐Sigma into equipment reliability/maintenance applications is quite original since this methodology has traditionally been limited to manufacturing and only recently to administrative processes. The outcome is of significant value as it opens up a new perspective into the development of reliability improvement measures for plant equipment.

References

16