All Days · 2002 · 17 citations · 0 references
EngineeringPetroleum EngineeringHydraulicsReservoir EngineeringReservoir SimulationWell Completion DesignWell ControlFlotationInflow ControlOpen Hole Completion DesignOpen-hole CompletionWater Cut AnalysisWater Cut EffectsWater Cut ManagementWater Production Control
Abstract A system has been developed and tested that reduces the production from zones producing high water cut in open hole screen completions. By use of flotation balls with neutral density in formation water, the system automatically reduces a nozzle area on each joint with increasing water cut. The oil selective inflow control system (OS) is used to reduce flow from zones that significantly contribute to the water cut in a well. A reservoir simulation tool has been configured to incorporate the OS functionality.