Investigation of a New Tool To Unload Liquids From Stripper Gas Wells

Ahsan J. Ali, Stuart Scott, Brad Fehn

SPE Production & Facilities · 2005 · 27 citations · 9 references

Concepts

Abstract

Summary Liquid loading in low-production gas wells is a common problem faced in many producing regions around the world. The techniques available to remove liquids from the wellbore impose significant capital and operational costs. This study investigates a new method for unloading and restoring continuous production of low-rate (i.e., stripper) gas wells. The performance of a patented vortex-flow-modifier tool was examined using a 125-ft vertical-flow loop of 2-in.-diameter clear PVC pipe. The vortex device was found to alter the basic flow structure in the pipe, resulting in improved liquid flow. The tool was observed to reduce tubing-pressure loss by up to 17% and lower the minimum gas velocity required to lift liquids up the tubing string.

References

9