Changes in Completion Strategy Unlocks Massive Jurassic Coalbed Methane Resource Base in the Surat Basin, Australia

Raymond L. Johnson, Stephen H. Scott, M.R. Herrington

2006 · 11 citations · 6 references

Concepts

Abstract

abstract Since the late 1990's, operators have drilled a number of coalbed methane (CBM) core and exploration wells to definethe gas resource potential of the vast and relatively unexplored Jurassic Walloon Subgroup (SG) in the Surat Basin. Unfortunately, early pilots used completion techniques that failed to fully assess the true potential of this reservoir. Firstly, openhole completions were trialed but had limited success because of fines influx and well collapse. Next, cased and cemented wellbores incorporating hydraulic fracturing stimulation treatments were attempted to improve wellbore stability, reduce fines influx and increase gas production; these wells were ineffective and many experienced problematic casing failures. Finally, an isolated, openhole, under-reamed completion technique was trialed and achieved commercial flow rates representative of the drill-stem testing data indicated from earlier exploratory drilling. This paper describes the process, experiences and results leading to the present completion strategy. We note production, permeability and skin factors associated with early completions, as well as results obtained from large-scale implementation of this more effective completion method. As a result of this change, the resource potential of the Walloon SG has grown significantly and the operator has proven 3,712 Bcf of reserves from a previously undeveloped resource area.

References

6