Water Science & Technology · 2004 · 12 citations · 5 references
EngineeringEnvironmental EngineeringWater Resources ManagementWastewater TreatmentWater Resources EngineeringWater TreatmentCombined Sewer OverflowsEffluent TreatmentNutrient RemovalPhosphorus RecoveryPhosphorus RemovalPrimary TreatmentEffluent Discharge StandardsEffluent ManagementEffluent StandardsSurface Loading RateTotal Suspended Solids ReductionUpgradingWastewater Nutrient DischargeWastewater Treatment Plants
At many large wastewater treatment plants (WWTPs) the increased hydraulic load, caused by combined sewer systems during storm events, results in primary effluent overflow when the capacity of further treatment is exceeded. Due to stringent effluent standards, regulating the total discharge from the WWTPs, the Rya WWTP in Göteborg and the Sjölunda WWTP in Malmö will have to reduce the impact of primary effluent overflow. Separate, high rate, precipitation processes operated only during high flow conditions have been investigated in pilot units at the two WWTPs. Precipitation in existing primary settlers operated at a surface loading of 3.75 m/h removed phosphorus to 0.35 mg/l. The Actiflo process was also shown to remove suspended solids and phosphorus well. BOD was reduced by 50-60%. With such processes the overall effluent concentrations from the plants can be reduced significantly. Key upgrading features are small footprints, short start up time and high efficiency.
5
Water Science & Technology · 1998 · 51 citations
Engineering, Environmental Engineering, Water Resources Management +17