Concepedia

Publication | Closed Access

Congestion-induced wind curtailment mitigation using energy storage

13

Citations

11

References

2014

Year

Abstract

Allowing the connection of additional renewable energy sources (RES) in areas with limited transmission capacity is becoming of a serious concern. Building new transmission lines only provides a long-term solution to cope with this issue due to the fact that it takes much longer time (up to 5-10 years) compared to time needed to build new wind farms (about 1 year). Storage is proven to be an effective solution to make maximal use of existing grid infrastructures in the short-term. This paper proposes a cost-benefit optimization formulation for optimally sizing the storage in a wind-storage system which is connected to an external spot market via limited transmission lines. A small test system is studied in order to find the optimal size of storage to avoid congestion by allowing revenue to be generated only via reducing the congestion-induced wind curtailment. Additional revenue streams can be also included to maximize the monetary value of the wind-storage system.

References

YearCitations

Page 1