Pseudosteady-State Flow Equation and Productivity Index for a Well With Noncircular Drainage Area

A.S. Odeh

Journal of Petroleum Technology · 1978 · 11 citations · 0 references

Concepts

Abstract

Most reservoir engineering flow-equations and calculations assume radialgeometry. Radial geometry implies that the drainage area of a well is circularand the well is located at the center. In many cases, the drainage area of awell is rectangular, triangular, or some other noncircular shape. Applicationsof equations based on radial geometry to noncircular drainage area could leadto appreciable error. In many wells, pseudosteady-state flow occurs during mostof their productive life. The productivity index (PI) concept is used in apseudosteady-state, depletion-type reservoir to predict the oil wellsperformance as a function of the difference between the average reservoirpressure and expected flowing bottom-hole pressure of the pressure and expectedflowing bottom-hole pressure of the well. The PI concept is not used for gaswells. The most common equations used by the reservoir engineer to describepseudosteady-state flow and productivity index are .....(1) .....(2) and .......(3) where qo = oil production rate STB/D qg = gas production rate, Mscf/D k =effective permeability, md h= thickness, ft