SPE Annual Technical Conference and Exhibition · 2003 · 44 citations · 14 references
EngineeringPetroleum EngineeringDrillingHeat TransferThermal AnalysisCementing OperationsWell HydraulicsWell Performance AnalysisWellbore FlowWellbore Heat TransferWellbore HydraulicsCement Slurry DesignFinite Difference AnalysisTemperature ProfilesTransient Temperature ModelingTransient Thermal BehaviorTransient Wellbore Thermal ResponseWellbore DeviationsWellbore Temperature Distribution
Abstract Failure to estimate the correct temperature during cementing operations can often lead to long delays in rig operations or can allow the flow of gas or water from shallow over pressured formations. API (American Petroleum Institute) Sub-committee 10 (Well cements) has developed methods to determine the bottom hole circulating temperature (BHCT) for the proper design of cementing slurries. These methods work adequately in most cases. But, in wells that are deviated and have multiple temperature gradients like those found offshore in deep water basins, these methods are inadequate. This paper presents a finite difference model developed to predict the wellbore and formation transient temperature behavior during fluid circulation in the wellbore. It also provides the information on temperature recovery after the cement slurry becomes static. Emphasis is placed on evaluation of wells with multiple temperature gradients, multiple fluid circulation schedule, and wellbore deviations. The effect of offshore water currents is also discussed. The predictions of the wellbore temperature profiles and return temperatures from this model are validated through actual measured wellbore temperature profile history, including offshore and onshore cases. The paper also discusses the impact of job execution parameters such as fluid density, flow rates, inlet temperature, and fluid rheology. Guidelines are provided to help the engineer design an optimal working schedule to achieve one's particular goal of controlling wellbore temperature at desired level during actual cement placement operation.
14
H.J. Ramey · Journal of Petroleum Technology · 1962 · 1.1K citations · Full text
Engineering, Petroleum Engineering, Drilling Engineering +13