Publication | Closed Access
A New Heuristic for Three-Machine Flow Shop Scheduling
57
Citations
9
References
1996
Year
Job SchedulerEngineeringIndustrial EngineeringScheduling ProblemGeneral Flow ShopProduction SchedulingBusinessSystems EngineeringLogisticsSupply Chain ManagementNew HeuristicN Log NCombinatorial OptimizationN JobsInteger ProgrammingOperations Research
This paper considers the problem of sequencing n jobs in a three-machine flow shop with the objective of minimizing the makespan, which is the completion time of the last job. An O(n log n) time heuristic that is based on Johnson's algorithm is presented. It is shown to generate a schedule with length at most 5/3 times that of an optimal schedule, thereby reducing the previous best available worst-case performance ratio of 2. An application to the general flow shop is also discussed.
| Year | Citations | |
|---|---|---|
Page 1
Page 1