Publication | Closed Access
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
188
Citations
38
References
2008
Year
Total TardinessEngineeringHybrid AlgorithmSimulated AnnealingImproved Simulated AnnealingComputer EngineeringSystems EngineeringHybrid Optimization TechniqueModeling And SimulationMultiphase FlowCombinatorial OptimizationDiscrete OptimizationTotal Completion TimeOperations Research
| Year | Citations | |
|---|---|---|
Page 1
Page 1