A New Device Designed for Direct Yield Stress Measurements of Cement Spacer

Chris Gordon, R. L. Morgan

Canadian International Petroleum Conference · 2007 · 16 citations · 0 references

Concepts

Abstract

Abstract Successful zonal isolation requires proper cement placement with adequate bonding to the casing and formation. To achieve successful zonal isolation, spacer fluid and cement slurry must be properly designed to enable effective displacement and eroding of the drilling fluid from the wellbore annulus. The rheological properties of these fluids, as well as pumping rate, directly impact erodibility via hydraulic shear stress at the wall. Yield stress and viscosity of the spacer/cement are important rheological properties that control flow and displacement ability of the material in the wellbore. Thus, accurate measurement of the yield stress and viscosity of a cement spacer in the lab is critical to properly designing and tailoring the material. Much information about these rheological properties is still unknown, primarily due to lack of reliable measuring techniques and instrumentation in the oil field. Common, albeit significant, problems that hinder obtaining reliable data include; particle migration, slip at the measuring surface, and non-uniformity of the sample during its rheological measurements. A new device has been developed that has the capability of directly measuring the yield stress and rheological properties of the spacer/cement samples. The new device was developed based on a vane-shear concept where the effects of particle migration and slip are minimized. In this paper, the features of this unique device are described and the experimental technique developed for yield stress property measurement is outlined. Typical measured flow properties of time-independent yield stress materials are presented and discussed. Comparisons of the new device's experimental data with those of the accepted methods used in yield stress measurement are also made to illustrate the applicability and limitations of the device. Introduction During well construction, cement is displaced down through the casing and back up the annulus between the casing and formation. In general, the cement serves two main functions:Mechanical support of the casing.A barrier to prevent transmission of fluids in the annular space from one zone to another. The second function is the reason cementing is also referred to as zonal isolation. Zonal isolation is critical for a cement job to be considered successful. The wellbore fluid designs (drilling fluid, spacer, and cement) depend on the properties of the wellbore, such as formation fluid pressure and formation fracture pressures. To control the wellbore, the fluid designs must exceed the formation fluid pressure to hold the fluids within the formation while not exceeding the formation fracture pressure. Exceeding the fracture pressure would result in loss of circulation, which is costly and time consuming. Most zonal isolation jobs are designed around the equivalent circulating density (ECD) of the wellbore. The ECD is a function of annulus area, density, pump rate, and rheology parameters of the different fluids. Bingham Plastic, Hershel-Bulkley, and Casson models are commonly used to model the rheological parameters of the various drilling fluids, spacers, and cements used during the wellbore construction. All these models account for the fluid having a finite yield stress, otherwise referred to as yield point.