Field Development Expansion of a Giant Oil Field in Abu Dhabi Using Artificial Islands as Drilling and Production Centers

A. Modavi, W. W. Martin, Abdul Hakeem Al Muflehi, J. V. Walters, Gamal M. Ismail

Abu Dhabi International Petroleum Exhibition and Conference · 2008 · 27 citations · 0 references

Concepts

Abstract

Abstract The current development plan for the subject field is based on drilling from numerous Well Head Platform Towers (WHPTs). The current production buildup target would require many more new WHPTs and hundreds of kilometers of new pipelines connecting the new and current towers to the field central processing complex and its satellites. An alternative field development strategy based on a few drilling/production centers (artificial islands and/or large platforms), instead of numerous new WHPTs, will enable: Significant CAPEX reductionCover current or future variations of the subsurface planMitigation of Jack-Up rig availability & cost uncertaintiesFlexibility to capture up-side potentials during field life cycleProvisions for cost-effective/phased facilities installationsEnhanced field operability, at much lower OPEXReduced downtime losses Islands as drilling/production centers, with land-based rigs further enable: Maximum flexibility for further developmentHonoring current reservoir management guidelines,Low risk (conservative) extended reach drilling