Deep Geothermal Energy Production in Germany

Thorsten Agemar, Josef Weber, Rüdiger Schulz

Energies · 2014 · 166 citations · 5 references

DOIFull text

Open access

Concepts

TL;DR

Germany’s low‑enthalpy hydrothermal resources are mainly used for balneology, space and district heating, and the government supports geothermal development through funding, incentives, and feed‑in tariffs, leading to rapid growth—especially in the south—with nearly 200 facilities now operating or under construction. New geothermal projects require a feasibility study that incorporates detailed geological, hydraulic, and temperature data sourced from the online GeotIS information system. Between 2003 and 2013, geothermal district heating output rose from 60 GWh to 530 GWh, while power generation grew from 0 GWh to 36 GWh.

Abstract

Germany uses its low enthalpy hydrothermal resources predominantly for balneological applications, space and district heating, but also for power production. The German Federal government supports the development of geothermal energy in terms of project funding, market incentives and credit offers, as well as a feed-in tariff for geothermal electricity. Although new projects for district heating take on average six years, geothermal energy utilisation is growing rapidly, especially in southern Germany. From 2003 to 2013, the annual production of geothermal district heating stations increased from 60 GWh to 530 GWh. In the same time, the annual power production increased from 0 GWh to 36 GWh. Currently, almost 200 geothermal facilities are in operation or under construction in Germany. A feasibility study including detailed geological site assessment is still essential when planning a new geothermal facility. As part of this assessment, a lot of geological data, hydraulic data, and subsurface temperatures can be retrieved from the geothermal information system GeotIS, which can be accessed online [1]. GeotIS, which can be accessed online [1].

References

5