SPE Production Engineering · 1986 · 38 citations · 2 references
EngineeringPetroleum EngineeringDrillingHydrogeologyWell TestingPerforation DesignSteam InjectionWell CompletionWell Completion DesignInjection Profile ControlInjection Well DesignLimited Entry PerforatingLimited-entry PerforationOpen Hole Completion DesignPerforatingSteam Injection Well DesignWellbore Performance
Summary A completion technique for steam-injection wells that ensures improved profile distribution of steam into several independent sands is being used at the South Belridge field in California. Previously, steam profiles were poor for many of the conventionally perforated (two ⅜-in. [9.5-mm] -diameter holes per foot) injection wells. This standard completion does not guarantee that the thicker, higher-permeability sands will not act as thief zones with respect to the thinner, tighter sands open in the same wellbore. Limited-entry perforating (typically one hole per 15 to 20 ft [4.6 to 6.1 m] of gross interval with at least one in each major sand member) provides the best assurance of achieving a uniform injection profile in single-wellbore multisand completions.
2
Mechanical engineers' handbook
Choice Reviews Online · 2016 · 143 citations