SPE Production Engineering · 1988 · 12 citations · 4 references
EngineeringCivil EngineeringPetroleum EngineeringHydraulic EngineeringSand ControlWell TestingWell ControlWell HydraulicsWell Performance AnalysisWell Test DesignWellbore HydraulicsBitumenCohesionless Soil BehaviorFlow In Horizontal WellsFlow In Vertical WellsHeat Transfer In Horizontal WellsHeat Transfer In Vertical WellsSand Control In Horizontal WellsSand Management
Summary A device was designed to solve a severe case of sand inflow into horizontal wells at the Athabasca Tar Sands pilot plant in Fort McMurray, Alta. The sand problem at this pilot resulted from a combination of three conditions: a fine-grained, cohesionless sand; the cyclic injection of steam; and the production of steam, water, and high-viscosity bitumen. A new type of filter, designed to overcome this problem, has application to the control of solids in wells drilled in a variety of formations producing liquids or gas. It was first designed and tested in the laboratory with a physical simulator; then it was fabricated and tested in vertical wells at the Athabasca pilot plant.
4