Concepedia

Publication | Closed Access

A Recovering Beam Search algorithm for the one-machine dynamic total completion time scheduling problem

93

Citations

10

References

2002

Year

Abstract

This paper deals with the one-machine dynamic total completion time scheduling problem. This problem is known to be NP-hard in the strong sense. A polynomial time heuristic algorithm is proposed which applies the recently introduced Recovering Beam Search (RBS) approach. The algorithm is based on a beam search procedure with unitary beam width and includes a recovering subroutine that allows to overcome wrong decisions taken at higher levels of the beam search tree. It is shown that the total number of considered nodes is bounded by n where n is the jobsize. The proposed algorithm is able to solve in very short CPU time problems with up to 500 jobs outperforming the best state of the art heuristics.

References

YearCitations

Page 1