Environmental Technology · 2013 · 30 citations · 22 references
EngineeringChemical EngineeringEnvironmental EngineeringReaction EngineeringWastewater TreatmentWater TreatmentNitrogen RemovalNutrient RemovalCarbon-nitrogen Ratio ManagementCarbon-to-nitrogen Ratio EffectsCycle TimeCycle Time ControlDenitrificationDenitrification ProcessesSequencing Batch Reactor OperationWastewater Treatment Nutrient Removal
The effects of cycle time (CT) (8, 12 and 16h) and C/N ratio (3, 6 and 9) on nitrogen removal efficiencies in a bench top sequencing batch reactor treating slaughterhouse wastewater were investigated under different operating conditions: in condition 1, the reaction comprises an aerobic/anoxic phase and in condition II, the reaction comprises anoxic I/aerobic/anoxic II phases (with pre-denitrification). The greatest percentages of nitrogen removal were obtained in the CT range from 12 to 16 h and C/N ratios from 3 to 6, with mean efficiency values of 80.76% and 85.57% in condition I and 90.99% and 91.09% in condition II. Although condition II gave a higher removal of total inorganic nitrogen (NH4+ - N + NO2- - N + NO3- - N) than condition I, only condition I showed statistically significant and predictive regression for all the steps of nitrogen removal.
22
Quenton Fontenot, Christopher P. Bonvillain, Marilyn B. Kilgen et al. · Bioresource Technology · 2006 · 161 citations
Engineering, Chemical Engineering, Environmental Engineering +14
Romain Lemaire, Rikke Louise Meyer, Annelies Taske et al. · Journal of Biotechnology · 2005 · 157 citations
Engineering, Chemical Engineering, Environmental Engineering +17