AIP conference proceedings · 1998 · 30 citations · 4 references
Natural SciencesNuclear EngineeringPhysicsInstrumentationNuclear InstrumentationParticle PhysicsAccelerator PhysicsCollider PhysicsDetector TechnologyElectron Beam PhysicsOptical InstrumentationParticle DetectorsBeam InstrumentationBeam Position MonitoringBeam ProfilingDetector ConstructionElectron Beam DiagnosticsLepton Collider PhysicsMonitorsReal-time Control Strategies
. PEP-II is a 2.2 km-circumference collider with a 2.1 A, 3.1 GeV positron ring (the low-energy ring) 1 m above a 1 A, 9 GeV electron ring (the high-energy ring); both rings are designed to allow an upgrade to 3 A. Since June 1997, we have had three runs totaling 14 weeks to commission the full HER, reaching a current of 0.75 A. Positrons were transported through the first 90 m of the LER in January 1998, with full-ring tests planned for the summer. This workshop provides a timely opportunity to review the design of the beam diagnostics and their performance, with an emphasis on what works, what doesn't, and what we're doing to improve it. This paper discusses: the synchrotron-light monitor, including both transverse imaging onto a CCD camera and longitudinal measurements with a streak camera; beam position monitors, with processors capable of 1024-turn records, FFTs, and phaseadvance measurements; tune measurements with a spectrum analyzer, including software for peak track...
4
Betatron function measurement at LEP using the BOM 1000 turns facility
Beam diagnostics based on time-domain bunch-by-bunch data
D. Teytelman, J. Fox, H. Hindi et al. · AIP conference proceedings · 1998 · 14 citations
Commissioning experience from PEP-II HER longitudinal feedback
S. Prabhakar, D. Teytelman, J. Fox et al. · AIP conference proceedings · 1998 · 11 citations · Full text