SPE Production Engineering · 1989 · 11 citations · 1 references
EngineeringOperations ManagementOffshore EngineeringOffshore Petroleum EngineeringProduction EngineeringGas InjectionGas Lift SystemsGas Lift Valve DesignOffshore Oil And Gas FacilitiesProduction OptimizationWell Performance AnalysisFlue Gas InjectionGas Lift OperationsGas Lift OptimizationGas Lift ValvesGas Lift Well PerformanceInjection Gas Lift Valve DesignTrainingValve Spacing Design
Summary Through a variety of field examples, this paper describes how increased production rates were obtained from gas-lift wells. These results were achieved through a wide range of activities, including special training for production operators, optimizing gas injection rates, modifying surface piping systems, identifying and replacing defective wireline-retrievable gas-lift valves, and improving gas-lift design techniques. A major modification of a standard gas-lift design technique is discussed in detail. The modification optimizes the depth of gas injection throughout the life of a well. An empirically derived chart, which relates valve spacing to the PI of a well, is also presented.
1