International Journal of Computer Integrated Manufacturing · 1995 · 17 citations · 21 references
EngineeringProject SchedulingIndustrial EngineeringAgv WorkloadFms Simulation ModelOperations ResearchSystems EngineeringLogisticsExperimental InvestigationComputer EngineeringManufacturing SystemsScheduling (Computing)Due-date Assignment RulesInteger ProgrammingScheduling AnalysisScheduling ProblemAutomationProduction SchedulingScheduling (Production Processes)Real-time SystemsScheduling Rules
Abstract This paper investigates the performance of due-date assignment rules in a flexible manufacturing system (FMS) Although emphasis is placed on a comparison of due-date assignment rules, machine and automated guided vehicle (AGV) scheduling rules are also evaluated under various experimental conditions using an FMS simulation model. The mean job tardiness is the measure of performance by which the rules are compared. The sensitivity to AGV workload, buffer capacity, and processing time distribution is also investigated to assess the robustness of the due-date assignment rules.
21
Some Tactical Problems in Digital Simulation
R. W. Conway · Management Science · 1963 · 350 citations
Deborah A. Davis, C. Dennis Pegden · 1988 · 295 citations · Full text
Engineering, Industrial Engineering, Digital Manufacturing +20